STEEL POSTS

Standard Pre-Gal Posts from 800mm to 4000mm with Straight, Half, Tee and Corner Top Plates and Concrete Bottom Plates can be made to order within 1-2 working days.
​
Hot Dipped Galvanised Posts can be made to order with a Lead Time of 10-15 Working Days
Powder Coated Posts can be made to order with a Lead Time of 15 - 21 Working Days
Plate Options
![]() Corner PlatePost with Corner Top Plate Plate Can be Welded to the Top or Bottom of the Post | ![]() Open EndOpen Top & Bottom Post No Plates Included | ![]() Half PlatePost with Half Top Plate. Can be Welded to the Top or Bottom of the Post |
---|---|---|
![]() Straight PlatePost with Straight Top Plate. Can be Welded to the Top or Bottom of the Post | ![]() V-Up Top PlatePost with V-UP Top Plate Available in 120mm,150mm,180mm and 210mm | ![]() Tee PlatePost with Tee Top Plate Can be Welded to the Top or Bottom of the Post |